Friday, March 23, 2012

KITCHEN REMODEL - DAY ELEVEN

AND TWELVE. AND MORE. PROBABLY INCLUDES DAYS THIRTEEN AND FOURTEEN.

INSTALLED THE CABINET DRAWERS, CONNECTED THE EXHAUST HOOD, AND BROUGHT IN THE POTS AND PANS.


STAINED AND FINISHED A PANEL TO BOX IN THE FRIDGE, AND HUNG THE HIGH CABINET FOR FOOD STORAGE.


PUT IN CABINETS ON BOTH SIDES OF THE STOVE. INSTALLED, SANDED AND OILED THE BUTCHER-BLOCK COUNTERS.


ABOVE THE SINK, STARTED INSTALLING THE SERIES OF SHELVES TO HOLD DISHES AND JARS. THE GLUE-UP:


No comments: