AND TWELVE. AND MORE. PROBABLY INCLUDES DAYS THIRTEEN AND FOURTEEN.
INSTALLED THE CABINET DRAWERS, CONNECTED THE EXHAUST HOOD, AND BROUGHT IN THE POTS AND PANS.
STAINED AND FINISHED A PANEL TO BOX IN THE FRIDGE, AND HUNG THE HIGH CABINET FOR FOOD STORAGE.
PUT IN CABINETS ON BOTH SIDES OF THE STOVE. INSTALLED, SANDED AND OILED THE BUTCHER-BLOCK COUNTERS.
ABOVE THE SINK, STARTED INSTALLING THE SERIES OF SHELVES TO HOLD DISHES AND JARS. THE GLUE-UP:
No comments:
Post a Comment