I BUILT THE FLOOR OF THE TREE HOUSE AND FIGURED OUT THE DESIGN FOR THE STAIRS.
STACKED UP ALL THE LUMBER IN A NEAT LITTLE PILE AND STASHED AWAY THE SLIDE. I'LL BE BACK IN A WEEK, AFTER DOING SOME WORK ON "DAD'S OFFICE."
THIS LONG WEEKEND, I'LL BE REBUILDING THE BACK STEPS AT THE HOUSE. LOTS OF DESTRUCTION AND CONSTRUCTION. DROP BY AND TAKE A LOOK.
No comments:
Post a Comment