THE CONCRETE SLAB WAS CURED AND READY TO GO. TIME TO BUILD!
THE TRUCK DELIVERED MOST OF THE LUMBER FOR THE JOB, AND I SPENT SOME TIME PUTTING IT IN MANAGEABLE PILES IN THIS SMALL SPACE.
I PUT TOGETHER THE FLOOR JOISTS AND SQUARED UP THE WHOLE THING.
I WANT THE FLOOR TO BE WARM, SO I ADDED INSULATION. WHILE I WAS DOING THIS, I KEPT THINKING ABOUT MAKING A GIGANTIC BED.
NAILED OFF THE PLYWOOD SUB-FLOOR AND CALLED IT A DAY.
A VIEW BACK TOWARDS THE TRUCK AND THE CUTTING-STATION TENT. SNOW IS IN THE FORECAST, SO THIS MIGHT GET INTERESTING...
No comments:
Post a Comment