MY 'RAIN HAT'
I MEASURED AND CUT ALL THE PIECES UNDER THE WORK TENT...
...NAILED THEM ALL TOGETHER...
...AND LIFTED THE WALL INTO PLACE. THIS WILL BE THE SECOND DOORWAY.
I MEASURED OUT ANOTHER WALL, BUILT SOME OF IT, BUT RAN OUT OF 2X4s. I HEADED TO 'MR. PLYWOOD' FOR MORE LUMBER. I LOVE THIS VINTAGE SIGN OF ANTHROPOMORPHIC PLYWOOD. (PLEASE NOTE THE PENCIL BEHIND HIS EAR.)
No comments:
Post a Comment