Friday, March 23, 2012

KITCHEN REMODEL - DAY ELEVEN

AND TWELVE. AND MORE. PROBABLY INCLUDES DAYS THIRTEEN AND FOURTEEN.

INSTALLED THE CABINET DRAWERS, CONNECTED THE EXHAUST HOOD, AND BROUGHT IN THE POTS AND PANS.


STAINED AND FINISHED A PANEL TO BOX IN THE FRIDGE, AND HUNG THE HIGH CABINET FOR FOOD STORAGE.


PUT IN CABINETS ON BOTH SIDES OF THE STOVE. INSTALLED, SANDED AND OILED THE BUTCHER-BLOCK COUNTERS.


ABOVE THE SINK, STARTED INSTALLING THE SERIES OF SHELVES TO HOLD DISHES AND JARS. THE GLUE-UP:


Monday, March 12, 2012

KITCHEN REMODEL - DAY NINE

AND TEN.

BUILT A NARROW CABINET FOR THE SPACE BETWEEN THE DISHWASHER AND WALL.


DISHWASHER ARRIVED, SHRINK-WRAPPED AND SHINY.


PUT IN THE BUTCHER-BLOCK COUNTER, CUT A HOLE FOR THE SINK, AND DROPPED IT IN.


INSTALLED THE SOAP DISPENSER, SPIGOT, FAUCET AND SPRAYER. LOOKS LIKE A ROW OF SMALL ABSTRACT SCULPTURES.


TURNED ON THE WATER AND LET IT FLOW.


Monday, March 5, 2012

KITCHEN REMODEL - DAY SEVEN

ASSEMBLED SIX CABINETS FROM PARTS AND PIECES. 


THESE ARE FROM A LITTLE SWEDISH IMPORT SHOP THAT I DISCOVERED OUT BY THE AIRPORT. I'VE BEEN IMPRESSED BY THE QUALITY OF THE HARDWARE AND THE PRECISE FIT OF THE PIECES.


DAY EIGHT. 
PICKED UP A TEN-FOOT LENGTH OF STAINLESS STEEL FOR THE BACKSPLASH. BURNED THRU THREE SAW BLADES CUTTING OUT THE HOLES FOR THE OUTLETS.


GLUED IT TO THE WALL. USED WOOD BATTENS TO HOLD IT PLACE WHILE THE GLUE DRIES.


Tuesday, February 28, 2012

KITCHEN REMODEL - DAY SIX

THE WALL COLOR LOOKS A LITTLE DIFFERENT IN THE DAYLIGHT.


INSTALLED THE OAK FLOOR.



Wednesday, February 22, 2012

KITCHEN REMODEL - DAY THREE

ALSO DAY FOUR AND FIVE.

AFTER MULTIPLE LAYERS OF MUD AND MUCH SANDING, THE NEW DOORWAY BLENDS SEAMLESSLY WITH THE EXISTING WALLS.


PAINTED THE CEILING, THE WINDOW TRIM AND THREE OF THE WALLS AN OFF-WHITE COLOR. 


LATE NIGHT PAINTING SESSION ON THE FOURTH WALL. THE COLOR IS ESPRESSO BROWN WITH A WEE BIT OF PURPLE. 


TORE UP THE FLOOR (SHEETS OF PLYWOOD AND LINOLEUM) AND GOT DOWN TO THE SUB-FLOOR. THIS IS THE OAK FLOORING IN THE REST OF THE HOUSE AND A SAMPLE OF THE NEW KITCHEN FLOOR, WHICH SHOULD BE A CLOSE MATCH.


Thursday, February 16, 2012

KITCHEN REMODEL - DAY ONE

THIS WAS A 1960s KITCHEN. CABINETS WERE FALLING APART. NO DISHWASHER. LINOLEUM FLOOR. POOR LIGHTING.

IT'S TIME TO BRING IT INTO THE 21st CENTURY.


REMOVED CABINETS, SINK AND BACKSPLASH.


STOVE WAS AS BIG AS A TANK WITH ONLY ONE FUNCTIONAL BURNER.


REMOVED OVERHEAD CABINETS, EXHAUST FAN IN CEILING, AND BROUGHT IN A NEW STOVE WITH BURNERS THAT PRODUCE HEAT.


DAY TWO.
REMOVED THE DOOR TO THE BASEMENT, WHICH IS ALREADY REMODELED AND AN INTEGRAL PART OF THE HOUSE.


REMOVED DOOR TRIM AND PUT UP SHEETROCK AND CORNER BEADS.


FIRST COAT OF MUD.


Sunday, February 12, 2012

EDITOR SUITE - FINAL PHOTOS

ALL DONE!


THE WEST WALL, WITH 'BUMP-OUTS' FOR THE DOOR AND A WINDOW.


SOUTH WALL, WITH SUN-CATCHING WINDOWS. THIS BUMP-OUT IS FOR THE DESK AND ONE SET OF BOOKSHELVES.


EAST WALL. THIS BUMP-OUT IS FOR THE OTHER SET OF BOOKSHELVES.


SOUTH WALL. THIS IS FOR THE READING/SLEEPING NOOK.


COMPLETING THE CIRCUIT, TO THE ENTRY ON THE WEST SIDE.


ON THE INTERIOR, A WALL AND LOWERED CEILING MAKE THE FOYER A DISTINCT AREA, SEPARATE FROM THE OFFICE AND READING/SLEEPING NOOK.


THE DESK AND BOOKSHELVES ALONG THE SOUTH WALL.


THE EAST WALL, WITH MORE BOOKSHELVES, AND A HIGH SHELF ABOVE THE READING/SLEEPING NOOK:


THE READING/SLEEPING NOOK FEELS COZY AND PRIVATE.


COMPLETING THE 360 DEGREE PAN OF THE INTERIOR, RETURNING TO THE WALL THAT SEPARATES THE FOYER FROM THE NOOK.


THIS WAS A WONDERFUL PROJECT TO DESIGN AND BUILD. THANKS TO JOY, ROBB, DAVID, PAT, TED, KEN, SHION AND MATT.