Monday, March 21, 2011

READING ROOM - DAY EIGHTEEN

STARTED OFF THE DAY WITH A VISIT TO THE ReBUILDNG CENTER FOR SOME LUMBER TO BUILD THE DESK. THIS IS A GREAT SALVAGE YARD WITH A COVERED LUMBERYARD AND A GOOD SELECTION OF BOARDS PULLED FROM OLD HOUSES AROUND PORTLAND.


I WAS SEARCHING FOR SOME OLD-GROWTH STUFF, FROM BACK WHEN A 2X4 WAS REALLY TWO INCHES BY FOUR.


BEFORE THINGS GOT DUSTY, MATT McCALMONT AND I WENT FOR LUNCH.


AFTERWARDS, MATT USED A METAL DETECTOR TO FIND THE NAILS EMBEDDED IN THE WOOD.


AND I REMOVED THEM.


THEN MATT GEARED UP AND TRIMMED THE EDGES.


WE GLUED THEM TOGETHER AND LEFT THEM OVERNIGHT.


Sunday, March 20, 2011

READING ROOM - DAY SEVENTEEN

KEN PUT UP ALL THE SHEETROCK, AND ON DAYS EIGHTEEN, NINETEEN AND TWENTY, I CONSTRUCTED THE 'SKELETON' FOR THE BUILT-IN BOOKSHELVES.


THESE SHELVES ATE 50 2X4s. FIFTY! I CALCULATED IT BEFORE I STARTED, BUT COULDN'T BELIEVE IT WOULD TAKE THAT MUCH MATERIAL...


THE SHELVES ARE ABOUT 8 FEET LONG, WITHOUT A MID-SPAN SUPPORT, SO THEY HAD TO BE A LITTLE OVER-BUILT.


ALONG THE BACK WALL, THE TWO SHELVES CREATE AN ALCOVE FOR THE BUILT-IN DESK.


Tuesday, March 15, 2011

READING ROOM - DAY FIFTEEN

AND DAY SIXTEEN. THE CEILING AND WALLS WERE INSULATED...


...AND THEN WE WERE READY TO ROCK!


KEN ROMERO MOVED SO FAST THAT HE WAS A BLUR. HE'S QUICK AND SKILLED, SMOOTHING OUT ALL THE WALLS AND CEILING WITH A THIN COAT OF PLASTER. IT'S GOING TO LOOK GREAT.


Thursday, March 10, 2011

READING ROOM - DAY FOURTEEN

FINISHED ALL THE SOFFITS AND PUT THE EXTERIOR SIDING ON THE BACK WALL. 


THIS WAS A SHORT DAY. WHEN I RETURNED HOME, THERE WERE SOME BIG OLD BLUEBERRY BUSHES WAITING.


THEY'RE ABOUT 30 YEARS OLD, AND WILL PRODUCE FRUIT THIS SUMMER. I MULCHED THEM WITH PINE NEEDLES, PINE CONES AND SMALL BRANCHES. THAT'S WHAT THEY LIKE,  APPARENTLY.


Wednesday, March 9, 2011

READING ROOM - DAY THIRTEEN

I CONTINUED TO 'WATERPROOF' THE STRUCTURE, WRAPPING IT WITH A MOISTURE BARRIER.


KEPT TRYING TO THINK OF SOME PUN THAT INVOLVED THE WORD 'HOUSE' AND 'WRAP' BUT COULDN'T COME UP WITH ANYTHING GOOD...


I NAILED UP THE SOFFITS, USING SOME OLD CARPENTER'S TRICKS TO HOLD THE SHEETS OF PLYWOOD OVERHEAD WHILE I NAILED THEM OFF. (ONE SECTION IS PRE-PRIMED. THE REST ARE PLAIN WOOD.)


WITH THE SOFFITS BOXED IN, IT'S STARTING TO HAVE SOME VISUAL 'WEIGHT'.


READING ROOM - DAY TWELVE

THE FORECAST CALLED FOR RAIN, BUT IT WAS A  SUNNY SPRING DAY, SO TED LEACH WAS ABLE TO ROLL OUT THE 'TORCH-DOWN' ROOF.


IT'S STARTING TO LOOK LIKE A BACKYARD LIBRARY...


Monday, March 7, 2011

READING ROOM - DAY ELEVEN

...AND DAYS SEVEN, EIGHT, NINE AND TEN. (SORRY, IT TOOK A WHILE TO GET A NEW CAMERA.) OVER THE LAST FEW DAYS, I FINISHED THE SOUTH WALL.


AND THE WEST WALL. AND THE LITTLE CONNECTOR WALL WITH ITS NARROW WINDOW.


I PUT UP THE ROOF JOISTS.


AND TODAY I NAILED DOWN THE ROOFING PLY. NOW ALL SIX SIDES OF THE CUBE ARE COMPLETE!