PUT UP THE FOURTH WALL.
POURED CONCRETE BASES FOR THE OPEN-ROOF SUPPORTS. PUT UP THE COLUMNS AND BEAMS AND BOLTED IT ALL TOGETHER.
WHEN THE ROOF IS OPEN, IT WILL REST ATOP THIS FRAMEWORK.
BOUGHT 20' LENGTHS OF ANGLE IRON AND METAL BASE PLATES. TOOK IT ALL OVER TO JAMES AND HE WELDED THE TRACKS FOR THE ROLLING ROOF.